The
new airport has an initial capacity of 45 million annual passengers,
76 flights an hour and over 3 million tons of cargo. 2 runways with
a distance width of 2,200 meters, each 3,700 meters and 4,000 meters
long, able to accommodate A380. Also included are 51 aircraft stands
with aerobridge gates of which 4 are designed to handle the super
jumbo Airbus A380 and 69 remote parking bays and 2 car parking
buildings connected to the passenger terminal to serve over 5,000
cars. A gross 563,000-square-meter area is set for an assortment of
24/7 Duty Free shops. The completed project will feature 4 runways
totally, resulting in an ultimate capacity of 100 million annual
passengers, 112 flights an hour and 6.4 million tons of cargo.
|